Originally posted by Alessandro
View Post
Mike Sinnett, Boeing's 787 chief project engineer, explained the careful design philosophy employed for the 787's battery system, the first to serve as a starter for an auxiliary power unit and emergency power back-up in a commercial aircraft.
"I design a cell to not fail and then assume it will and the ask the next 'what-if' questions," Sinnett said. "And then I design the batteries that if there is a failure of one cell it won't propagate to another. And then I assume that I am wrong and that it will propagate to antoher and then I design the enclosure and the redundancy of the equipment to assume that all the cells are involved and the airplane needs to be able to play through that."
"I design a cell to not fail and then assume it will and the ask the next 'what-if' questions," Sinnett said. "And then I design the batteries that if there is a failure of one cell it won't propagate to another. And then I assume that I am wrong and that it will propagate to antoher and then I design the enclosure and the redundancy of the equipment to assume that all the cells are involved and the airplane needs to be able to play through that."
Comment